The Jiangong brand colored elastic waterproof coating (commonly known as, etc.) produced by Ningde City, Fujian Province Xinjian Gong Waterproof Material Technology Co., Ltd. is based on acrylic copolymer emulsion, with a certain amount of modified materials, additives and fillers. It is a water-based, single-component, color-adjustable, non-toxic, odorless, environmentally friendly polymer waterproofing material carefully formulated using a specific process. It has high solid content, good physical and mechanical properties, good water resistance, weather resistance and durability. It can be used for exposed waterproof liquid construction at room temperature without seams. It is particularly advantageous for construction sites with complex shapes and structures where open flames are prohibited. After the membrane, an integrated seamless rubber-plastic layer with high elongation and high tensile strength is formed. The waterproof effect is excellent and the comprehensive performance reaches the advanced level of similar domestic products. In 1999, it passed the provincial scientific and technological achievement appraisal and was approved as a recommended product by the China Construction Industry Association and the Fujian Provincial Construction Committee. In 2005, it won the title of Fujian Provincial Building Materials Reliable Product and the third prize of Ningde City Science and Technology Progress Award. [Material Features]
. Water-based, single-component, adjustable color, non-toxic and odorless, easy to construct, and is an environmentally friendly polymer waterproof material.
.After coating and forming a film, an integrated seamless rubber-plastic layer with high elongation and high tensile strength will be formed, with good waterproof effect.
3. Liquid construction at room temperature has no joints, which is particularly advantageous for construction sites with complex shapes and structures where open flames are prohibited.
.High solid content, good physical and mechanical properties, good water resistance, weather resistance and durability, and can be used as exposed waterproofing.
. Best used for waterproofing and repair projects in toilets, pools, and walls.
【Performance Index】
Execution Standard -.
[Scope of application]
Roofing: all kinds of new and old flat-sloping roofs and gutter eaves, especially suitable for waterproofing and anti-seepage in irregular-shaped parts.
.Ground construction: waterproof and moisture-proof finishes for toilets, kitchens, pools and exterior walls.
3. Underground construction: internal and external walls, floors, underground tunnels, elevator rooms, etc.
. Used in combination with various waterproof membranes or waterproof coatings to form a facing waterproof layer to improve the waterproofing effect and durability.
[Construction Method]
Follow the relevant provisions of the "Roofing Engineering Quality Acceptance Specifications"
Base layer treatment: The base layer must be flat, firm, clean, and free of open water. The yin and yang angles should be made into arc shapes. For old roofs, the original cracked and bulging waterproof layer and dust should be removed, and the low and damaged areas should be smoothed. Leakage areas must be plugged first. The base layer should be flat and there should be no open water. Special parts such as water inlets and grating joints should be subjected to flexible sealing treatment first, and the general painting process is the yin and yang corners, then the vertical surfaces, and finally large-area construction.
. Primer construction: Mix water and paint according to weight ratio. Stir well before use. The use of primer can improve the permeability of the paint to the base layer and enhance the adhesion.
3. Apply paint: Rolling, scraping or brushing can be used to apply paint. It is advisable to use a thin layer coating method for multiple times. Each application should not be too thick. It is generally divided into 3 applications, depending on the application. The total thickness of different waterproof parts is up to .mm. The last coat can be applied only after the first coating dries and forms a film. Weak links should be covered with carcass reinforcement materials.
.After each coat of coating is dry, the construction quality should be checked. If there are any leaks or bulging, they should be repaired.
[Notes]
Before construction, the paint should be fully stirred evenly, except for the primer. No water should be added at will to ensure quality.
. Overlaying carcass reinforcement materials should generally be pasted on the second coat.
3. Construction is strictly prohibited below ℃ or in rainy, snowy and freezing weather. No other construction work is allowed on the coating before the coating is dry to avoid damaging the waterproof layer and affecting the waterproofing effect.
.In order to ensure the waterproof effect, it is recommended that the dosage of this coating be more than .kg per square meter.
【Packaging, Storage and Transportation】
Packed in plastic drums, iron drums, and kilograms.
.This product is non-toxic, flame-retardant and non-corrosive. It is a general chemical product and can be transported as non-dangerous goods.
3. This product should be stored in a ventilated and dry room at a temperature of ℃ - ℃. Pay attention to the sealed packaging. The effective storage period is six months from the date of production.
951/911 color elastic waterproof coating